RJP Rod
RJP method takes a comprehensive approach, monitoring the whole process including proportioning, direct pressure delivery, injection, formation cutting, mixing and slurry collection of hardening material slurry.It is a 360° all-directional foundation stabilization method applicable for both vertical and inclined construction.It features minimal disturbance to surrounding environment and foundation, enables deep-depth stabilization and underwater construction, and allows flexible selection of slurry discharge locations.
{Torque^≤4000N·M}
{Depth^≤50m}
{Weight^94kg}
{Depth^≤50m}
{Weight^94kg}
Torque:≤4000N·M
Depth:≤50m
Weight:94kg
APPLICATION SCENARIOS
3040
PRODUCT OVERVIEW
The basic principle of the RJP method is the same as other high-pressure jet grouting methods: it uses ultra-high-pressure jet fluid to destroy the soil structure, mixes the destroyed soil particles with grout, and forms a consolidated body after solidification.However, the reinforcement mechanism of the RJP method is unique. It mainly cuts and destroys the soil layer twice:The first cutting uses a composite jet of ultra-high-pressure water and air in the upper section. Based on the first cutting, the soil is cut again, which increases the cutting depth and enlarges the diameter of the consolidated body.
{Vertical and inclined construction available.}
{Enables deep foundation improvement, with a maximum depth of 60 m, large pile diameter and high construction quality.}
{Jet grouting parameters can be adjusted anytime to control the size of the consolidated body, greatly improving project quality.}
{Double soil cutting ensures uniform mixing of soil particles and grout.}
{Reinforcement diameter is freely selectable, and the reinforcement range can be adjusted from 5° to 360°.}
{Enables deep foundation improvement, with a maximum depth of 60 m, large pile diameter and high construction quality.}
{Jet grouting parameters can be adjusted anytime to control the size of the consolidated body, greatly improving project quality.}
{Double soil cutting ensures uniform mixing of soil particles and grout.}
{Reinforcement diameter is freely selectable, and the reinforcement range can be adjusted from 5° to 360°.}
- •Vertical and inclined construction available.
- •Enables deep foundation improvement, with a maximum depth of 60 m, large pile diameter and high construction quality.
- •Jet grouting parameters can be adjusted anytime to control the size of the consolidated body, greatly improving project quality.
- •Double soil cutting ensures uniform mixing of soil particles and grout.
- •Reinforcement diameter is freely selectable, and the reinforcement range can be adjusted from 5° to 360°.
TECHNICAL SPECS
{Specs,[
Torque^≤4000N·M ,
Depth^≤50m,
Length^1500 mm,
Rod OD^142mm,
Weight^94kg]}
{Channel,[
^Grout^Air^Water,
Pressure^≤40Mpa^≤ 30Mpa^≤ 1Mpa,
Flow^≤200L/min^≤100L/min^≥4m³/min]}
Torque^≤4000N·M ,
Depth^≤50m,
Length^1500 mm,
Rod OD^142mm,
Weight^94kg]}
{Channel,[
^Grout^Air^Water,
Pressure^≤40Mpa^≤ 30Mpa^≤ 1Mpa,
Flow^≤200L/min^≤100L/min^≥4m³/min]}
Specs
| Torque | ≤4000N·M | ||
| Depth | ≤50m | ||
| Length | 1500 mm | ||
| Rod OD | 142mm | ||
| Weight | 94kg |
Channel
| Grout | Air | Water | |
| Pressure | ≤40Mpa | ≤ 30Mpa | ≤ 1Mpa |
| Flow | ≤200L/min | ≤100L/min | ≥4m³/min |
RELATED PRODUCTS
PROJECT CASES
3331^3337^3340^3334
China

Ammann SJL-120 Rotary Jet Drill Rig – MJS Method Construction in Jiaozuo, Henan
Anman SJL-120 MJS cutoff wall in Jiaozuo, Henan — 56m case for MJS method construction, cut-off wall...
China

Tianjin – SJL-120 Rotary Jet Grouting Reinforcement – RJP Method
SJL-120 RJP jet grouting in Tianjin — 2000mm pile, 30m depth case on jet grouting method, soil stabi...
China

Anhui Suzhou – SJL-120 – MJS Method Construction
Anman SJL-120 MJS jet grouting cut-off wall in Suzhou, Anhui — 2000mm pile, 25m depth with Micropile...
China

Wuxi, Jiangsu – SJL-120 Rotary Jet Grouting Cut-off Wall – MJS Method – Subway Project
Rotary jet grouting system with MJS method in Wuxi. Anman jet grouting rig handles 2000mm piles at 2...



